The construction work around the Upper Gate has begun!
It is important to us to allow all Weißenhorn residents to participate in this project.
Due to the difficult accessibility, we have created an insight into the premises with a 360 ° tour and a flight tour and are pleased
so that the building complex can be opened for you again.
After an intensive planning period, we have been given the unique opportunity to realize a significant project in the heart of our city. Our historic old town is characterized by the building ensemble including the Wool/Weighing House, the Kray, and the Upper Gate.
This was made possible by our inclusion in the "Inside instead of Outside" urban development funding program in 2018. Subsequently, a funding pool of eight funding providers was established and coordinated. A total of €10 million was reserved for our project. After the museum closed its last exhibition in 2019 due to limited load-bearing capacity, retrofitting the building complex, including the Wool and Weighing House, the Upper Gate, and the Kray, was unavoidable, and our inclusion in the funding program was a stroke of luck. The structural retrofitting of the three buildings alone amounts to €9 million, thus ensuring future access through the Upper Gate into our old town.
Our responsibility towards our historical heritage and the opportunity to create this new centre for art and culture, which can reach far beyond the ensemble, will continue to provide a wide range of opportunities and added value for our citizens of Weißenhorn through the unique connection of the location with the urban structure.